- Introduction
- Features
- Specifications
HK-3090PM Oil foaming characteristics tester is designed according to GB/T 12579-2002 《Test method of Foaming Characteristics of Lubricating Oils》.The tendency of oils to foam can be a serious problem in systems such as high-speed gearing, high-volume pumping, and splash lubrication. Inadequate lubrication, cavitations, and overflow loss of lubricant can lead to mechanical failure. This test method is used in the evaluation of oils for such operating conditions.、
Summary of test method:
The sample, maintained at a temperature of 24℃ is blown with air at a constant rate for 5 min, then allowed to settle for10 min. The volume of foam is measured at the end of both periods. The test is repeated on a second sample at 93.5℃, and then, after collapsing the foam, at 24℃.
◆ Adopts the 800*480 LED touch screen, Chinese and English are optional. Easy- operation with the prompt menu.
◆ Adopts the PID intelligent temperature control technology, users can pre-set temperature within the temperature control range.
◆ Easily software upgrading and maintenance through the USB connector
◆ Intelligent measure the water level, in avoid to dry heating.
◆ With the precise timing function, easy for operation.
1、 Testing hole:4个
2、 Temperature control range:Room temperature~100℃
3、 Temperature control accuracy:±0.5℃
4、 Air supply:Built- in air supply ≥400mL/min
5、 Air permeability of Gas diffusion header :under 2.4KPa (250mmH2O ), it is 3000~6000mL/min
6、 Heating rate: ≤2500W
7、 Measuring cylinder specification:1000mL(Specialized)
8、 Outside dimension:L991mm×W422mm×H710mm
9、 Weight:≤50kg(No water)
Application Environment:
1、 Power supply:1)AC220V, 50/60HZ; AC240V , 50 HZ; 2)AC120V, 60HZ, (Optional).
2、 Ambient temperature:(10~35)℃;
3、 Ambient relative humidity:≤93%RH
# The instrument should be put into a no air flow laboratory and on a stable and no glare table.
# The laboratory should have fire extinguisher and other extinguish material.
# Don’t put any inflammable、explosive and strong corrosive gas or liquid around the instrument, no strong electromagnetic interference and obvious mechanical shock.
1、Main instrument |
1 |
2、Measuring cylinder components |
1 |
3、Power cable |
1 |
4、Protective tube |
2 |
5、Drying tower components |
1 |
6、PU PIPE(6mm) |
6 |
7、Input refrigerator |
1(Optional) |
8、Operation manual |
1 |
9、Warranty bill |
1 |
10、QC |
1 |